STRUCTURE
Reinforced Cement Concrete.
BRICK WORK
9” Thick external wall & 4 ½” thick internal walls.
WALL FINSHING
All internal wall & Ceiling will be P.O.P. with Priming Coat.
WINDOWS
Aluminum Window with m.s grill.
WATTER SUPPLY
Water Supply shall be available with tube well and common o/h tank .
FLOORING
Drawing/Dinning
Vitrified tiles up to24” x 24” in floor with 6” high skirting.
Bed Room/Balcony/Passage
White/Grey Ceramic tiles size Min. to24” x 24in floor with 6” height skirting.
Kitchen
Anti skid white/grey ceramic tiles size Min. to24” x 24 in floor with 6” high skirting.
Cooking Slab will be Green Marble Slab and 2’.5” height wall tilling above Cooking Slab.
Toilets
Anti Skid Ceramic tiles flooring size : Min 1’ x 1’ and 6’ Door height Colour glazed tiles on wall.
DOOR’S
Frame
Sal wood (Main) and other angle frame.
Shutter
32mm thick Water Proof flush door with Sy. Enamel Paint.
Fittings
Stainless Steel. One Magic eye at Entrance door.
SANITARY & PLUMBING
Fittings
All Sanitary, Plumbing, Pipe & Pipe fitting will be ISI make.
Drawing/Dining
Wash basin will be White Vitreous China Clay Sanitary Ware with Pillar Cock.
Kitchen
Steel Sink with long body bibcock.
Toilet
I.W.C./E.W.C. of white Vitreous China Clay Sanitary Ware with P.V.C. Cistern, Bib Cock Stop Cock, Shower rose .C.P. Fitting are used in ISI make.
ELECTRICAL
Single Phase Supply concealed wiring with Multi stand fire resistant copper wire of ISI make.
Drawing/Dining/Bed Room
Two Light Point, One Fan Point , and One Plug Point . One AC point any one convenient Bed Room.
Balcony
One Light Point / One plug Point.
Kitchen
One Light Point, One 15 Amp, Plug Point & One exhaust fan point.
Toilets
One Light Point & One exhaust fan point.
At Entrance:- One Calling Bell Point.
Fittings & Accessories will be used semi Modular (ISI make).
OTHER FACILITIES:- :- Emergency Power Supply of 300 Watts.
Power Back-up point in other common area and for water pump’s, street light etc.
Freeze Point: One 15 Amps. Plug point in Drawing/Dining at Convenient location .
N.B.:- Possession will be given after 30 days of final payment.